Estate-Caliber Full Home Remodeling in Beverly Hills

WDC delivers complete home transformations in Beverly Hills — managing every permit, trade, and finish decision from a single point of accountability. We bring San Francisco’s highest-standard construction practices to the Westside’s most demanding renovation environment.

From the Beverly Hills flats to the hillside estates above Sunset, our projects involve structural reconfiguration, whole-home MEP upgrades, premium finish specification, and the full permit strategy that Beverly Hills Building & Safety requires. One contractor. One schedule. Zero compromises.

Book a Project Consultation

The Beverly Hills Renovation Environment

Beverly Hills operates its own Building & Safety department independent of LADBS — which means different plan check timelines, different inspector relationships, and a distinct set of requirements that demand a contractor who knows the system specifically.

Full home remodels in Beverly Hills typically require coordination across multiple agencies:

  • Beverly Hills Building & Safety — plan check for all structural and MEP work (6–10 weeks for full-scope submissions)
  • Beverly Hills Fire Department (BHFD) — fire sprinkler review for major remodels and structural additions
  • Planning Commission — design review for exterior alterations in certain districts and hillside zones
  • HOA Architectural Committees — design approval required on many Beverly Hills estates before permit submission
  • Title 24 Energy Compliance — 2022 California standards applied to all conditioned space alterations

WDC manages all of it. Our permit team works directly with Beverly Hills Building & Safety and pre-coordinates with planning when exterior alterations are in scope — preventing the revision cycles that routinely add months to projects run by contractors unfamiliar with the City’s system.

What a Full Home Remodel Includes

A WDC full home remodel is coordinated across every trade. You work with one project manager and one schedule — not three contractors with competing timelines and no accountability between them.

  • Structural reconfiguration — open-plan conversions, load-bearing wall removal, floor plan redesign
  • Whole-home MEP upgrade — electrical panel, plumbing stack, multi-zone HVAC
  • Kitchen and bathroom remodels integrated into the full permit set
  • Primary suite expansion and custom closet systems
  • Premium finish specification and procurement — stone, tile, millwork, fixtures, hardware
  • Smart home integration — Lutron, Crestron, or Savant systems
  • Landscape and hardscape coordination as part of the overall project scope

How We Run a Beverly Hills Renovation

Step 1 — Discovery Consultation

We walk the property, review any existing plans, and scope the project against your priorities and timeline. No design fees, no commitment at this stage.

Step 2 — Feasibility and Permit Strategy

Before design dollars are spent, we map what is achievable under Beverly Hills zoning and identify every permit required. Hillside properties, historic overlay districts, and HOA-governed estates each carry distinct requirements.

Step 3 — Design Development

Our design partners produce construction-ready drawings. WDC manages the design team directly, holding them to the build schedule and constructability standards.

Step 4 — Permit Submission and Plan Check

We submit to Beverly Hills Building & Safety and manage plan check from submission through corrections. Full-scope structural remodels typically run 6–10 weeks in plan check. We track status directly with the department and respond to corrections without client involvement.

Step 5 — Construction

Our crews manage all trades under a single site supervisor. Clients receive weekly updates with photo documentation. Job sites are maintained with the neighbor relations and security standards Beverly Hills residential neighborhoods expect.

Step 6 — Final Walkthrough and Close

Punch list, certificate of occupancy, and a complete documentation package — permit records, warranty documentation, and as-built drawings for your property files.

Beverly Hills Full Home Remodeling — FAQ

How long does a full home remodel take in Beverly Hills?

Timeline depends on scope and permit complexity. A full structural remodel with exterior alterations typically runs 12–18 months from contract to certificate of occupancy. Projects in hillside zones or historic overlay districts may require additional time. WDC provides a detailed schedule before construction begins.

Do you handle properties with HOA design review?

Yes. Many Beverly Hills estates are governed by HOA architectural committees that require design approval before permit submission. We prepare the full documentation package for HOA review and coordinate the approval process as part of our pre-permit workflow.

How does Beverly Hills permitting differ from working with LADBS?

Beverly Hills operates its own Building & Safety department — independent fee structure, plan check timelines, and inspector protocols. We work the Beverly Hills system specifically, not contractors who primarily run LADBS jobs and treat Beverly Hills as a minor variation.

Do you manage the architect and design team?

Yes. WDC coordinates the full project team. You have one point of contact rather than managing separate relationships between a designer, general contractor, and individual subcontractors.

Why does WDC reference its San Francisco background?

WDC was founded in San Francisco — a market defined by complex permitting, steep-lot construction, and clients with uncompromising expectations. Beverly Hills demands the same standard. Our team carries those expectations into every Westside project.

Ready to Start Your Beverly Hills Renovation?

WDC takes on a select number of full home remodel projects in Beverly Hills each year. If your project is in the planning stage, an early consultation allows us to map the permit path and establish an honest timeline before design costs are committed.

Book a Project Consultation

ENGAGEMENT · BY APPLICATION REVIEWED BY THE PRINCIPAL · WITHIN 48 HOURS

A NOTE BEFORE APPLYING

Apply for
Discovery.

WDC engages a limited number of full-home projects per year. Applications are reviewed personally by the principal — not by an intake coordinator, not routed to a sales pipeline. Discovery is a 90-minute conversation, fixed fee, with a written feasibility memo whether or not we proceed together.

01

Submit the application below. Real address, real budget envelope.

02

If the project is a fit, the principal responds within 48 hours.

03

Discovery scheduled at the WDC office or your residence. Fixed fee.

04

Feasibility memo delivered within seven days. Engagement decision yours.

APPLICATION

01

Who you are

02

The project

03

Anything we should know